IFC 4.3.2.20240809 (IFC4X3_ADD2) under development

5.4.8.2 PEnum_LifeCyclePhase

5.4.8.2.1 Semantic definition

5.4.8.2.2 Type values

Type Description
ACQUISITION

Acquisition

CRADLETOSITE

Cradletosite

DECONSTRUCTION

Deconstruction

DISPOSAL

Disposal

DISPOSALTRANSPORT

Disposal Transport

GROWTH

Growth

INSTALLATION

Installation

MAINTENANCE

Maintenance

MANUFACTURE

Manufacture

OCCUPANCY

Occupancy

OPERATION

Operation

PROCUREMENT

Procurement

PRODUCTION

Production

PRODUCTIONTRANSPORT

Production Transport

RECOVERY

Recovery

REFURBISHMENT

Refurbishment

REPAIR

Project responsible for the repair to a facility

REPLACEMENT

Replacement

TRANSPORT

Transport

USAGE

Usage

WASTE

Waste

WHOLELIFECYCLE

Wholelifecycle

USERDEFINED

User Defined

NOTDEFINED

Notdefined

Table 5.4.8.2.A

Edit on Github


Is this page difficult to understand? Let us know!